Construction methods · Caissons and marine foundations
Floating barges and spud barges
A flat-top barge with a crane, held by spuds (vertical legs dropped into the bed) or anchors. The cheapest way to put a rig or crane over water, and the most weather-sensitive: it moves with the waves and the tide, so precision work waits for calm.
Check barge stability and deck strength for each crane configuration and radius, and plan the spud or mooring arrangement for current, tide and wind.
Tow or push to site; drop spuds in shallow water or lay an anchor spread, with anchor positions agreed with the harbour authority.
Set the crane on mats with tie-downs, and fix the piling template or pile gate to the barge or, for better accuracy, to piles already driven.
Work within the barge-motion limits, adjusting for tide with the spuds or winches, and stop lifts when wind, waves or current exceed the limits.
Move between pile positions by spud walking or anchor handling, keeping a navigation watch and lights for passing traffic.
Demobilise by recovering anchors and spuds, and survey the bed for dropped objects.
Key numbers
Barge size30–80 m long
Crane100–300 t crawler on deck, on charts derated for list and motion
List and trim during liftswithin the crane maker's limits, typically 1–3 degrees
Crane work typically stops above about 0.5–1.0 m significant wave height
Day rateUSD 5,000–25,000
Where it fits
Sheet-pile cofferdams, driven piles in rivers and sheltered water, pier construction in calm estuaries, service of jack-ups.
Where it does not
Open sea, strong currents, bored piling that needs a fixed platform, tolerances tighter than the barge motion.
Choosing it
Choose barges for driven piles, sheet-pile cofferdams and pier works in rivers and sheltered water, where mobilisation is cheap and moves are frequent.
Prefer a jack-up for bored piling and precision work in exposed water; prefer a trestle where water is so shallow that barges ground at low tide.
Fix templates to driven piles rather than to the barge when position tolerance matters; the barge moves, the piles do not.
Plant, pace and money
PlantFlat-top barge 30-80 m, 100-300 t crawler crane, spuds, tugs.
ProductivityCheap to move, slow to hold position; downtime in weather.
CostUSD 5,000-25,000 per day.
Risks and controls
What goes wrong
Capsizing under an over-swung crane, spud failure in current, collision, crew falls.
Quality assurance
Stability calculation for each crane radius, mooring plan, weather limits.
Origins
Crane and pile-driving barges have been the basic floating plant of river and harbour work since steam piling in the 19th century; the spud barge, pinned to the bed by its legs, is the simplest step towards the jack-up.
Examples
River pier cofferdams worldwide; the game's default access for water piers under 6 m.