Construction methods · Shallow foundations, cofferdams and dewatering

Spread footing on soil or rock

A reinforced concrete pad wide enough that the bearing pressure stays below what the ground can carry, and deep enough to be below frost, scour and softened surface layers. On rock, the pad is keyed or dowelled into a cleaned, sound surface. The first foundation an engineer should try and the one most often rejected too early.

Also called: pad foundation, strip footing, footing on rock

Spread footing on soil or rock — concept diagram
Concept diagram (TheBridgeEng)

How it is done

  1. Fix the founding level from the borehole logs: below frost depth, below the design scour level and below any softened, organic or fill layer; design the excavation support (batters, trench boxes or sheeting) and groundwater control before digging.
  2. Excavate in layers and leave the last 150-300 mm to be removed with a smooth (toothless) bucket or by hand immediately before inspection, so the founding stratum is not disturbed.
  3. Hold point: the geotechnical engineer inspects and probes the formation (hand penetrometer, DCP, or plate load test where in doubt) and confirms it is the design stratum; soft pockets are dug out and replaced with lean concrete.
  4. Blind with 50-75 mm of lean concrete within hours of exposure; a clay formation is never left open overnight or in rain.
  5. On rock: strip weathered material to sound rock, clean joints with air and water, step sloping surfaces, grout dowels where sliding governs, and probe-drill 2-3 m below the base where boulders or cavities are possible.
  6. Fix reinforcement and pier starter bars, survey the starter positions, and cast the footing in a single pour where supply allows; cure and protect the surface from early drying.
  7. Backfill in compacted layers of 200-300 mm and install settlement points on the footing to record movement through construction and deck erection.

Key numbers

Where it fits

  • Dense sand, gravel, stiff clay or rock within 3-5 m of the surface, outside the scour zone.
  • Valley viaducts, overpasses, abutments on cut ground, pylons on rock.

Where it does not

  • Any river pier where scour can reach the footing.
  • Soft or loose ground within 1.5 times the footing width below the base.
  • Fills that are not engineered.

Choosing it

Plant, pace and money

PlantExcavator, compactor, concrete pump, dewatering pump if needed.
ProductivityA pad of 100 m3 takes a week from excavation to backfill on dry land.
CostUSD 250-450 per m3 of concrete in place; usually half to a third of a piled foundation for the same load.

Risks and controls

What goes wrong

  • Softening of clay formations left open in rain; heave or piping in sand below the water table; a boulder mistaken for rock.
  • Settlement of one footing relative to the next producing differential movement in continuous decks.

Quality assurance

Formation inspection by the geotechnical engineer before blinding, plate load or DCP tests where doubt exists, survey of the founding level against the borehole log.

Origins

Masonry piers and abutments have been set directly on bedrock since Roman times; the quantitative design of footings on soil rests on the bearing-capacity theory of Prandtl (1921) and Terzaghi (1943), later extended by Meyerhof and Vesic.

Examples

Most short-span overpasses in dry regions and on rock; arch springings and pylon footings on rock (Sydney Harbour, Hoover Dam bypass); river piers only where rock or dense gravel lies below the scour line.

Case studies

Golden Gate Bridge (south tower pier)USA · 1933-1937Built in the open strait inside a concrete fender ring; after a floated caisson was abandoned, the fender was used as a cofferdam and the pier was founded directly on serpentine bedrock roughly 30 m below the water surface.
Sydney Harbour BridgeAustralia · 1932The 503 m steel arch delivers its thrust through hinge bearings onto massive concrete skewbacks founded on Hawkesbury sandstone, with no piles.
Mike O'Callaghan-Pat Tillman Memorial Bridge (Hoover Dam bypass)USA · 2010A 323 m concrete arch over Black Canyon springing from footings excavated into the rock walls of the canyon.

Related methods

Further reading

Eurocode 7-1 Section 6 · AASHTO LRFD 10.6 · FHWA GEC 6 (shallow foundations) · Moulton, Tolerable Movement Criteria for Highway Bridges (FHWA, 1986) · BS 8004 Code of practice for foundations · Wyllie, Foundations on Rock